When a careless joiner decided to stray from manufacturing guidelines when installing a wooden flooring, unfortunately the resulting off piste work caused damaged to numerous limestone tiles . As there tiles were installed structurally it wasn’t a case of just replacing the tiles , therefore a call to scratch repair group was necessary.

Before

After
For all your hard surface repairs, get in touch.
Enjoy
SRG